Support
Maintenance and Replacement
We recommend periodic maintenance and the replacement of consumables so that the machine may always be used in good condition.
| Maintenance | Recommended timing |
Note |
|---|---|---|
| Friction shaft | Once per 1-2 year |
Take out the friction collar, then check the condition and replace the damaged parts. Adjust and correct the tension control system. |
| Drive system | Once per year | Check and replace the drive belt, pulley and some prats. |
| Consumables | Recommended timing |
|---|---|
| Bearing | 3-5 years |
| Drive belt | 3-5 years |
| Touch panel | 5-7 years |
| Powder brake | 10 years |
| Rubber roller | 5 years |
| Sequencer battery | 2 years |
Preventive Maintenance
-
- Friction shaft Maintenance

-
- Drive system Maintenance

-
- Replacement of PLC battery

-
- Replacement of Touch panel
